The Buffalo News
A $2.1 billion Bills stadium in Orchard Park blends architecture with advanced technology, using 3D modeling from the outset to plan 1.3 million square feet of space, thousands of materials, and potential sponsorship opportunities. The design features a snow-melting, sound-enhancing canopy, year-round grass with wireless field heating, extensive digital connectivity, and a separate technology building that will manage IT needs well before opening in 2026. The project emphasizes seamless entry, precise underground utility layout, and a data-driven approach to optimize spaces and operations. Together, these innovations aim to deliver a highly connected, resilient stadium experience with room to adapt in the future.